The purpose of this policy is to prevent employees from directly contacting crane loads during lifting, positioning, rigging up or landing of suspended loads where possible therefore keeping hands, feet and body out of harm’s way. The most hazardous parts of a lifting operation are hoisting and landing of the load. Therefore, at these critical stages, personnel must be as far away from the load as possible in case the load shifts or drops. Once a load is connected to a mechanical lifting device, personnel should not handle or touch a load with any part of their body as the load is being lifted or before the load is properly set down and all potential energy is released. There will always be certain jobs which will require “hands-on” for final positioning. MOSTLY, but these may be times when due to restricted workspace, working from elevated work platforms, awkward angles and body posture, that hands will need to be used.

Benefits of a Hands-Free Policy

What are the benefits of Safe Hands-Free Lifting?

Hands On/ Hands Off Requirements

Rig Floor - Hands-Off Required

In General: Loads under full control while maintaining clear communication between signalman and driller, air hoist or crane operator for the purpose of precise spotting, final positioning, stabbing pipe, connecting or disconnecting tubular e. 

Rig Floor Hands Off Required​

Drilling:

  • Trip Nipples
  • Rotary Master Bushings 
  • Rotary Bushing Inserts
  • Pipe picked up from V-Door

Logging: 

  • Lines Under Tension
  • Sheaves 

 

Running casing: 

  • Casing tools as they’re hoisted up the V-Door Ramp 
  • Fill UP Tool after “stinging into” the casing 
  • Top of casing collar while driller is lowering elevator prior to latching
  • Pin of casing joint during stabbing 

Cementing:

  • Cementing equipment as it is hoisted up the V-Door Ramp

 

Rig Floor Hands On Allowed ​

Rig Floor - Hands-On Allowed

In General: Loads under full control while maintaining clear communication between signalman and driller, air hoist or crane operator for the purpose of precise spotting, final positioning, stabbing pipe, connecting or disconnecting or disconnecting tubular etc.

Drilling: 

  • Bits 
  • Bit Brealers
  • Drill Collars
  • Reamers, Stabilizers, Drilling Subs, Lift Subs. Running Tools, Wear Bushings , Test Plugs. Packing Elements /Rotating Heads
  • HWDP
  • Drill Pipe 
  • Manual Tongs
  • Manual Elevators, Side-Door Elevators, Single-Joint Elevators
  • St-80’s 
  • Drilling Bales
  • Mud Buckets
  • Chiksan Hoses
  • Steam Heaters
  • Choke Consoles
  • Air Hoists 

Running Casing:

  • Stabbing Boards & Hoists/ Stabbing Boards 
  • Fill-Up Tool while rigging up, rigging down and while stabbing stinger into casing
  • Casing Elevators while rigging up, rigging down and latching or unlatching elevator
  • Casing Spiders
  • Casing Bales
  • Power Tongs
  • Individual Joints of Casing
  • Casing Swages & Safety Valves

Cementing:

  • Cement Heads & Manifolds 
  • Temporary Piping /Surface Iron Hoses

Logging:

  • Wire Line Sheaves
  • Logging Tools/ Survey Barrels 
  • Logging Adapters 
  • Tool Carts 

PSC - World's Leading Hands-Free Safety Tools Distributor​

project sales corp

————————————————

GET IN TOUCH WITH US NOW

28, Founta Plaza | Suryabagh | Visakhapatnam 530020. AP | India

Sales Team [email protected] 

Dispatch Details – [email protected] +91-772-9990-662

Phone No’s: (+91) 96031-66448; 8341687930

www.pscrigconsumables.com I www.pscropesoapdope.com

Linkedin: https://www.linkedin.com/company/1047966/

Facebook: https://www.facebook.com/projectsalescorpn

Instagram: https://www.instagram.com/projectsalescorp/

Youtube: https://www.youtube.com/@scorpiovizag